A smelter used a network of SCADALink 900-MB's
to monitor the status of their overhead cranes. Crane PLC status was transmitted via the
900-MB to a corresponding 900-MB located at the end of the 1 mile corridor. The radio
communication links for the different cranes were isolated from each other by configuring
different frequency hopping codes for each crane data link. The stationary 900-MB's were
mulidropped on an RS-485 line back to the host PC.