Industrial Solar Power System Troubleshooting

Solar Power Systems are used in remote industrial applications where there is no line power. Properly designed, installed, and maintained industrial solar power systems will have  high uptime and low maintenance.

SCADALink has successful supplied 1000’s of green and brown field solar power systems for remote instrumentation and control systems. Often our clients have commented about challenges they have had with their existing solar power systems.

In this blog we will discuss solar system problems; steps to diagnose problems; and solutions.

Potential Problems

Possible Problems include:

  • Indequate Solar Charging Capacity
  • Inadequte Battery Bank Sizing
  • Battery Overcharging
  • Extreme Battery Temperatures
  • Solar Panel Shading
  • Improper Installation
  • Oversized Solar Power Systems

Solar Power System Troubleshooting and Analysis

  • Get Accurate Load Profile – Accurately estimate or measure system loads.  Measure functioning equipment if possible.
  • Properly Sizing Solar Array –  Charge 1.25 to 1.5 x average load at lowest season of solar isolation.
  • Properly Size Battery Banks – Size to 10 to 15 days for autonomy at -40 degrees C. More required days for critical application and northerly environment with lower temperature, and lower sun.
  • Site Visit to assess existing installation.
  • On larger battery banks – Minimize number of parallel batteries strings.
  • Proper Installation
  • Make sure Solar Panels are oriented in optimum direction.

Solutions

Solar Panel Mounting and Orientation

Mount Panels high enough to prevent shading from vehicles, nearby structures, or trees. Angle solar panels suitable for environment to maximum solar isolation. In northern climates, install solar panels in vertically (near 90 degrees elevation angle) to shed snow and prevent snow build up.  Typically solar panel arrray are pointed 180 degrees S of N in the azimuth (directly south) unless that direction is shaded.

Solar Power System Monitoring

Incorporate remote voltage and current monitoring to can give an indication of power system health and warm of impending problems.  Many RTU, PLC,  and modems have integrated supply voltage monitoring.  For sites without existing voltage monitoring capacity one can use the SCADALink RIO100.  New larger solar regulators mady have these integrated features.  For larger solar power systems, battery management systems should be deployed.

Monitoring trends of voltage and current over time can help indicate proper solar system operation.

 

Insulated Battery Enclosures

The use of insulated enclosures or buildings can help maintain temperature of battery bank to maintain its load capacity.  AGM batteries at -40 degrees C will have 50% of the AH capacity at 0 degrees C.

Solar Charge Regulator Selection

Use Solar Charge Regulators with Low Voltage Disconnect to prevent batttery damage.  Utilize MPPT Charger optimize charge batteries during lower sunlight conditions. Ensure voltage input specs for solar regulators match the solar panel array voltage output. Excess solar array output voltage can result in shut-down or regulator damage. Shutdowns will result in lower total charge from solar panel array. Inadequate voltage will result to lower charge from solar panel array.

Solar Hybrid System incorporating Generators and Fuel Cells

For remote sites with larger loads, it may be necessary to integrate additional  charging mechanisms such as generators, fuel cells, and wind turbines into a solar hybrid system to provide adequate charging capacity such as that deployed in SCADALINK SOLARIS 3000.

 

 

Industrial Solar Power Systems – Remote Power Systems

Overview

Class 1 Div 2 Industrial Solar Power Systems

Remote Solar Power Systems for Hazardous Locations

Bentek Systems provides complete Class 1 Div 2 industrial solar power systems for hazardous locations and remote applications. Designed for reliable off-grid operation, SCADALink solar power systems support SCADA, RTUs, instrumentation, telemetry, telecommunications, pipelines, oil & gas, water, mining, and industrial automation.

Our integrated systems can include industrial solar panels, battery backup, solar charge controllers, DC power distribution, AC inverters, equipment enclosures, and custom mounting. Systems are available for 12 VDC, 24 VDC, and 48 VDC applications, with 120 VAC inverter options where required.

Class 1 Div 2 Solar Power Systems for Hazardous Locations

Remote industrial sites often require reliable power where utility service is unavailable and hazardous gases or vapours may be present.

Bentek Systems can engineer Class 1 Div 2 remote solar power systems around the site’s power, instrumentation, communications, environmental, and hazardous-location requirements. Systems can integrate solar power, battery backup, RTUs, telemetry, instrumentation, and communications into a complete remote monitoring and control solution.

Applications include oil & gas facilities, pipelines, measurement sites, remote SCADA systems, telecommunications, and environmental monitoring.

Hazardous-location ratings and approvals depend on the selected components and system configuration. Contact Bentek Systems to confirm requirements for your application.

Complete Remote Solar Power Systems

Reliable remote power requires more than selecting a solar panel. Bentek sizes each system around the complete electrical load, operating environment, solar availability, battery autonomy, communications equipment, and site requirements.

This system-level approach helps maintain dependable operation at unattended locations where loss of power can interrupt monitoring, communications, or control.

Industrial Solar Power System Configurations

Bentek Systems supplies systems ranging from compact instrumentation packages to larger installations supporting RTUs, communications, and industrial automation.

Telecommunication Site

Site Solar Panel

50 Watt – 12 VDC for Gas Well Flow Measurement Site

Experienced Field Worker and Solar Panel

400 Watt – 24 VDC at Oil Field RTU Site

Remote Solar Array Quad Picture 0   Remote Solar Array Quad Picture 1   Remote Solar Array Quad Picture 2   Remote Solar Array Quad Picture 3

280 Watt Solar Power for Portable RTU System

160W Solar Power for Portable RTU   160W Solar Power for Portable RTU-Slide View Solar Panel with BATbox

Mobile Solar Power

Mobile Solar Panel Side   Mobile Solar Panel Front   Portable Solar Batteries

Features & Specs

Class 1 Div 2 Industrial Solar Power System Features

SCADALink remote solar power systems can be engineered around the electrical load, operating environment, communications equipment, and hazardous-location requirements of each application.

  • Solar Panels / Arrays
  • Regulator / Wiring
  • Battery & Battery Enclosures
  • Solar Panel System Mounts
  • Optional Class 1 Div 2 Hazardous Area Approval

Applications

Class 1 Div 2 Solar Power Applications

SCADALink industrial solar power systems provide reliable off-grid power for remote monitoring, control, instrumentation, and communications applications where utility power is unavailable or impractical.

  • Instrumentation
  • Electronic Flow Measurement
  • Remote Monitoring/RTU Sites
  • Telecommunication Sites
  • Video surveillance

FAQ

Class 1 Div 2 Solar Power System FAQs

What is a Class 1 Div 2 solar power system?

A Class 1 Division 2 solar power system provides off-grid power for equipment operating in locations where hazardous gases or vapours may be present under abnormal operating conditions. Applicable requirements depend on the equipment, system configuration, and installation.

Can solar power be used in Class 1 Div 2 hazardous locations?

Yes. Solar power can support Class 1 Div 2 applications when the system and applicable components are properly selected for the site’s hazardous-location requirements.

Can a Class 1 Div 2 solar system power an RTU or SCADA system?

Yes. Properly sized solar and battery systems can power RTUs, instrumentation, radios, cellular modems, satellite communications, and other remote monitoring and control equipment.

How is an industrial solar power system sized?

System sizing considers the electrical load, operating profile, system voltage, geographic location, seasonal solar availability, battery autonomy, temperature, and system losses.

How much battery autonomy is required?

Battery autonomy depends on the load, location, environmental conditions, and reliability requirements. The battery bank is sized for the required operating period with limited solar charging.

What voltages are available?

SCADALink solar power systems can be designed for 12 VDC, 24 VDC, or 48 VDC, with 120 VAC inverter systems available where required.

Can Bentek design a custom Class 1 Div 2 solar power system?

Yes. Bentek Systems can engineer remote solar power around the site’s electrical load, instrumentation, communications, environmental conditions, battery autonomy, mounting, and applicable hazardous-location requirements.

Can the solar system integrate with SCADALink RTUs and telemetry?

Yes. Bentek can integrate solar power with SCADALink RTUs, wireless communications, instrumentation, telemetry, and related automation equipment to provide a complete remote monitoring and control solution.

Need a Class 1 Div 2 Remote Solar Power System?

Bentek Systems can help determine the solar array, battery capacity, enclosure, mounting, power distribution, RTU, and communications requirements for your application.

Contact Bentek Systems to discuss your Class 1 Div 2 remote solar power requirements.

Related Products & Accessories